Pricing

Our Pricing is split into these Stages:

Stage 1: Pre Contract Stage (RIBA Stages 2 to 4)

Fee based for design, specification and costing

Pricing is based on the size of the project, duration of service and the resources required to carry out the work. The Resources typically include Project Director, Design Manager and Designers.

What will you get in this Stage?

3D Design including room plans, renders, elevations and axonometric views. – deliverable

Specifications – deliverable

Product Book – deliverable

Costed Schedule- deliverable

Review Client information including brief, Schedule of Accommodation (SOA), Room Data Sheets (RDS) and Archiects Design carried out to date.Projects requiring robust and hardwearing products which are not typically supplied by the Furniture Industry.

Client/ User Engagements

Client Showroom Visits

Architectural and Services Coordination

Integration with Architectural and Services Design

Integration with overall project costs with QS/PM

Attend Design Team Meetings

Attend Client Meetings

Pricing Tiers

Project Banding

Period

Typical Fees

Small

1-2 months

£5,000 to £19,000

Medium

3-6 months

£20,000 to £30,000

Large

6 months or more

£30,000 and above

Fees are based on individual requirements and need to be assessed on a project by project basis taking account of a wide variety of factors.

Stage 2: Post Contract Stage (RIBA Stages 5 and 6)

On Site Delivery and Installation

Pricing is based on the scope of the interior and FF&E work for the project and is based on the pricing document produced in Stage 1, or from an external source.

What will you get in this Stage?

Installation of fixed furniture, fittings and equipment through the main contractor – this is usually a subcontract

Installation of loose furniture – this can be done through the Main Contractor or direct for the End User Client depending on the project procurement requirements.

Production Drawings

Post Contract Services Coordination with M&E Contractor

Health and Safety Compliance

Risk Assessments and Method Statements

Order Management and call off

Phasing Plans to coordinate with Main Contractor Programme

Pricing Tiers

This is based on the individual scope and requirements of each project.

Benefits of Our Pricing Model

All the expertise is provided in house. This includes Design, Product Knowledge, Product Pricing and Procurement Strategy.

Independent Design and Product Selection to suit your project requirements and budget.

Stage 1 fees have the benefit of helping to coordinate the design of the architectural and building services to a higher level of detail. This mitigates project design risk.

You could carry out this service using the Architect, Cost Manager or Suppliers. However, it is unlikely to be cheaper as it is usually fragmented and individually they don’t have the combined level expertise and detailed knowledge required.

The price levels are based on using over 50 OEM Manufacturers in the UK and abroad and on projects recently completed.

If the project has an insufficient, or no, budget for fees, we can roll up design fees into a total installation price, which can be funded from the installation budget.

arrow

Ready to talk?