The Brief

  • The school required a modern science laboratory and prep room facilities to replace the old and outdated lab.
  • The school remained open and the science lab was located on the 3rd Floor.
  • Hatfield developed the Black Cat design into Stage 5 construction drawings before construction
  • Hatfield Interiors were appointed by TJM Projects to install these rooms as part of their construction contract

Our Solution

  • Hatfield Interiors designed, specified and costed the science lab and prep room.
  • The design featured 4 island benches in a forward-facing arrangement which allows all pupils to face forward towards the teacher for tuition.
  • For experiments the pupils stand on the other side of the benches in a standing position and access the sinks, gas and electricity. This is safer than sitting.
  • We held several engagement meetings with the School and Black Cat to review and comment on the proposals. These included 3D drawings, fixed FF&E design and a detailed breakdown of costs.
    Once the proposals were signed off by the school, we were appointed by TJM Projects, the main contractor, to deliver the fixed FF&E.
  • This meant that the Client and Black Cat did not have to separately appoint us for the work and it allowed a seamless transition between the precontract and post contract FF&E work.
  • This meant we could deliver the schools detailed requirements within a tight programme and coordinate our work with the construction work during September.
  • This allowed the coordination of main contractor programme, coordination with mechanical and electrical services and installation of school IT.
  • The Laboratory incorporated the replacement of 4 fixed fume cupboards including new ducts from the roof into the laboratory.
  • The laboratory included new DDA pupil station including a rise and fall sink and table with gas tap and electrical outlets
  • We increased the width of the worktops to allow a service gap for the connection of new services
  • The design included new specialist Science Sinks in two sizes. One large sink for the Prep and smaller sinks for the pupils.

The Result

  • The Science Laboratory and Prep Room were completed on time during September.
  • The project was completed within budget.
  • Bright Futures Educational Trust and the school were delighted with the result.