Client
Bright Futures Educational TrustProject
Altrincham Grammar School for GirlsMain Contractor
TJM ProjectsArchitect
Black Cat Building ConsultancyScope of Work
Design and Installation of a New Science Laboratory and Preparatory RoomThe Brief
- The school required a modern science laboratory and prep room facilities to replace the old and outdated lab.
- The school remained open and the science lab was located on the 3rd Floor.
- Hatfield developed the Black Cat design into Stage 5 construction drawings before construction
- Hatfield Interiors were appointed by TJM Projects to install these rooms as part of their construction contract
Our Solution
- Hatfield Interiors designed, specified and costed the science lab and prep room.
- The design featured 4 island benches in a forward-facing arrangement which allows all pupils to face forward towards the teacher for tuition.
- For experiments the pupils stand on the other side of the benches in a standing position and access the sinks, gas and electricity. This is safer than sitting.
- We held several engagement meetings with the School and Black Cat to review and comment on the proposals. These included 3D drawings, fixed FF&E design and a detailed breakdown of costs.
Once the proposals were signed off by the school, we were appointed by TJM Projects, the main contractor, to deliver the fixed FF&E. - This meant that the Client and Black Cat did not have to separately appoint us for the work and it allowed a seamless transition between the precontract and post contract FF&E work.
- This meant we could deliver the schools detailed requirements within a tight programme and coordinate our work with the construction work during September.
- This allowed the coordination of main contractor programme, coordination with mechanical and electrical services and installation of school IT.
- The Laboratory incorporated the replacement of 4 fixed fume cupboards including new ducts from the roof into the laboratory.
- The laboratory included new DDA pupil station including a rise and fall sink and table with gas tap and electrical outlets
- We increased the width of the worktops to allow a service gap for the connection of new services
- The design included new specialist Science Sinks in two sizes. One large sink for the Prep and smaller sinks for the pupils.
The Result
- The Science Laboratory and Prep Room were completed on time during September.
- The project was completed within budget.
- Bright Futures Educational Trust and the school were delighted with the result.