Client
Central Bedfordshire Council and Chiltern Learning TrustProject
Refurbishment of Wootton Primary School, BedfordshireMain Contractor
Conamar ConstructionProject Manager
Pick EverardArchitect
Woods HardwickProgramme
June to August 2025Scope of Work
Design and Installation of Loose FF&EThe Brief
- Pick Everard and Woods Hardwick were appointed to project manage and design the refurbishment and new extension of the School.
- The existing school needed updating in line with modern standards. The site dates back to the 1970’s, when the school was built.
- Hatfield Interiors were appointed by Pick Everard under the Perfect Circle Framework to design and specify the loose FF&E for the project.
Our Solution
- Hatfield Interiors designed, specified and costed loose FF&E for the Primary School, covering 8 classrooms, a food technology space, a studio, and a SEN room.
- We held several engagement meetings with the School and Pick Everard to review and comment on the proposals. These included 3D drawings, proposed loose products and a detailed breakdown of costs.
- We worked with Pick Everard to coordinate the scope of loose FF&E between the work that was already in the construction contract and the items that the school would buy themselves, to ensure that there were no overlaps or gaps.
- One the proposals were signed off by the school, we were appointed by Conamar to deliver the loose FF&E. Conamar had already won the project under the scape Framework.
- This meant that the School and Central Bedfordshire Council did not have to separately appoint us for the work, which would have caused complications with their procurement Regulations.
- This arrangement allowed a seamless transition between the precontract and post contract FF&E work. This meant we could deliver the schools detailed requirements and also coordinate our work with the construction work.
- The appointment under Conamar was beneficial for the project as we could coordinate our work with their construction works.
- Conamar were delayed by 8 weeks because of the foundation design delays and the constricted site meant that we needed to install the furniture in temporary locations and then move them to the final locations in the last week of the summer term.
The Result
- The project was completed on time for the start of the September term start date.
- The project was completed within budget.
- Central Bedfordshire Council and Chiltern Learning Trust who run the School were delighted with the result.